EasyManua.ls Logo

Toshiba GR200 Series - (i)-2 Output signal to BO

Toshiba GR200 Series
1770 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
6F2S1914 (0.49)
GRL200 (Soft 033 & 037)
- 673 -
‡‡
Note: The synchronism voltage check is executed by the SYNCHK function.
§§
Note: A timer is provided to determine an operation failure. The maximum value of the
settings [SYNC01_TLRDIDRLI] or [SYNC01_TDRDI] is used as the decision time.
For more information on settings, see the SYNDIF function.
This logic has the input-point “DEV01_CONTROL_REQ” for the reception of a select
command. That is, the input-point must be mapped for communication. The function will fail
to operate if mapping is not performed correctly. We will discuss how to map the input-points
for IEC61850 communication in section 4.2.7.
Output signal to BO
The DPSY01 function can issue an output signal Selection success at the output point
DPSY01_OSL_BO_FLG, when the DPSY01 function determines that the Remote-Closing-
Control signal received is true. If the DPSY01 function determines that the Remote-Closing-
Control signal is not true, the DPSY01 function returns to the Wait for a command stage.
The user should note that the operation decision of the SYNDIF01 function is required
for the DPSY01 function; the operation decision is determined by the measurement of running
voltage and incoming voltage. Table 4.2-2 shows the relay-elements used in the SYNDIF01
function.
Table 4.2-2 Voltage checking elements in SYNDIF01
Relay-Element
Description
SyncRy1-VR
Running Voltage channel selector for DPSY01
SyncRy1-VI
Incoming Voltage channel selector for DPSY01
OVR1
Voltage for checking Live-Running Voltage for DPSY01
UVR1
Voltage for checking Dead-Running Voltage for DPSY01
OVI1
Voltage for checking Live-Incoming Voltage for DPSY01
UVI1
Voltage for checking Dead-Incoming Voltage for DPSY01

Table of Contents

Related product manuals