- 710 -
4.2.5 Measurement of operation intervals
The DPSY01 function can measure operation intervals (OT1 to OT4)†; the intervals OT1 to
OT2 can represent the period of time when a switch changes from “Closed” to “open”. In the
DPSY01 function the operation period is grouped into sub-time periods, as shown in Table
4.2-28. The user should set scheme switch [DPSY01-OPETMEN] to On.
Table 4.2-28 Intervals measured in the DPSY01 function
Signal “DPSY01_FEX_BO” sensed
Switch status is changed from “Closed” to
“Intermediate”
Switch status “Intermediate” sensed
Switch status is changed from “Intermediate” to
“Open”
Signal “DPSY01_OEX_BO” sensed
Switch status is changed from “Open” to
“Intermediate”
Switch status “Intermediate” sensed
Switch status is changed from “Intermediate” to
“Closed”
†Note: The function “operation time measurement” is also available in the DPSY02
function.
Sensing Intermediate state
Figure 4.2-37 Two intervals (OT1 and OT2) for Open-control
Figure 4.2-38 Two intervals (OT3 and OT4) for Closing-control
The user can clear the operation interval (OT1 to OT4) by key-operation of the “Operation
time” sub-menu (Figure 4.2-39) or operation from the remote-end. See chapter
User interface: