- 650 -
4.1-17.
2. Set scheme switch [SPOS01-LGEXFFCT] to Fixedlogic.
Replacing the original logic
If the user wishes to replace the operate condition logic completely, it can be achieved using
PLC connection point “User configurable condition”:
1. Connect the user-customized logic using “SPOS01IN_TMP_41”, listed as PLC#2 in
Table 4.1-17.
2. Set scheme switch [SPOS01-LGEXFFCT] to PLC.
Note: The user must program PLC logic “Control hierarchy condition”. The Control
hierarchy condition to be provided with the user-programmed PLC logic may be
43R/L; it may be connected using PLC connection point “SPOS01IN_TMP_28” in
Figure 4.1-29.
Note: The output of the operate condition logic is provided separately for On-execution
and for Off-execution. To see the outputs, refer to Table 4.1-18.
User configurable operate condition (PLC#2 connection
point)
Same Directional
Controlling Event
Control hierarchy (e.g. 43RL) (PLC connection point)*9
Additional condition (PLC#1 connection point)
Command “ON-control” received
Command “OFF control” received
received
SPOS01 function (Function ID: 510001)
Function “Automatic sequence control” is in progress
Double Command Blocking detected*2
Other devices traveling detected*3
Tripping *4 (“General trip”)
Unmatched condition detected *5
Event suppression detected *6
= SPOS01_F_QLT_SPP
BI board connection error detected*7
= SPOS01_F_BI_ERR
IED serious error detected
Users must setup this condition correctly
Figure 4.1-29 Operate condition logic for ON/OFF in SPOS01
1
Note: “Command blocking” disables any operation except for itself; “Command
Blocking” is implemented as “CBK”in software switch controller (SOFTSW).The
IEC 61850 standard defines communication blocking as “CmdBlk”. For more