6F2S1914 (0.49)
GRL200 (Soft 033 & 037)
- 948 -
‡‡Note: The “Operate failed” signal is issued when a state-change remains undetected
failing expiration of the setting applied to timer [TPOS01-RST]
§§Note: The “TPOS01-PIEX-BO” signal is issued when Fixlogic is set the scheme switch
[TPOS01-LGP1EXOT]. If the signal to be issued from the logic programmed by the
user instead of the logic shown in Figure 4.9-26, connect the “operate completed”
signal generated in the user-programmed logic to connection point#2 “User
configurable condition”. That is, set PLC to the scheme switch [TPOS01-
LGP1EXOT] and use “TPOS01IN_TMP_38”.
Output signal to BO
The TPOS01 function, in Figure 4.9-39, can issue a Operate P1-controlsignal at output point
TPOS01_P1EX_BO”, when the TPOS01 function determines that the signal “PLC-P1-Control”
is true.
(viii) Receiving “operate command P2-control” using the PLC function
Figure 4.9-40 depicts the reception of the operate command P2-control using the PLC function.
Signal generation by the
PLC function
P2 control by the PLC function
Do nothing
Operation
decision
Success
Failed
Operate logic
P1 control from the remote-end
P2 control from the remote-end
P3 control from the remote end
P1 control from the local-end
P3 control from the local-end
P2 control from the local-end
P1 control by the PLC function
Wait for a command
P2 control by the PLC function
P3 control by the PLC function
Select logics
Signal output
P3 control from the remote end
P1 control from the local-end
P1 control from the remote-end
P2 control from the remote-end
P2 control from the local-end
P3 control from the local-end
P1 control by the PLC function
P3 control by the PLC function
Wait for a next command
Figure 4.9-40 Outline of Operate command ‘P2-control’ function
Input signal from the PLC function
Figure 4.9-41 depicts the operation logic when an Operate command P2 (PLC-P2-Control)”
signal is generated by the PLC function. There are two input points for the reception of this
command signal, like in the Operate command P2 (PLC-P2-Control)” signal. That is, if an
interlock check is required, apply the signal at connection point (PLC#3:i.e.,
DEV01_P2_INTERLOCK). On the other hand, if an interlock check is not required, apply the
signal at connection point (PLC#4:i.e., DEV01_P2_COMMAND). PLC#3 and PLC#4 here are