- 948 - 
 
‡‡Note: The “Operate failed” signal is issued when a state-change remains undetected 
failing expiration of the setting applied to timer [TPOS01-RST]   
§§Note: The “TPOS01-PIEX-BO” signal is issued when Fixlogic is set the scheme switch 
[TPOS01-LGP1EXOT]. If the signal to be issued from the logic programmed by the 
user instead of the logic shown in Figure 4.9-26, connect the “operate completed” 
signal generated in the user-programmed logic to connection point#2 “User 
configurable condition”. That is, set PLC to the scheme switch [TPOS01-
LGP1EXOT] and use “TPOS01IN_TMP_38”. 
 
  Output signal to BO 
The TPOS01 function, in Figure 4.9-39, can issue a “Operate P1-control” signal at output point 
“TPOS01_P1EX_BO”, when the TPOS01 function determines that the signal “PLC-P1-Control” 
is true.   
 
(viii)  Receiving “operate command P2-control” using the PLC function 
Figure 4.9-40 depicts the reception of the operate command “P2-control’ using the PLC function. 
Signal generation by the 
PLC function 
P2 control by the PLC function 
P1 control from the remote-end 
P2 control from the remote-end 
P3 control from the remote end 
P1 control from the local-end 
P3 control from the local-end 
P2 control from the local-end 
P1 control by the PLC function 
P2 control by the PLC function 
P3 control by the PLC function 
P3 control from the remote end 
P1 control from the local-end 
 
P1 control from the remote-end 
P2 control from the remote-end 
P2 control from the local-end 
 
P3 control from the local-end 
P1 control by the PLC function 
 
P3 control by the PLC function 
 
Figure 4.9-40 Outline of Operate command ‘P2-control’ function 
 
  Input signal from the PLC function 
Figure 4.9-41 depicts the operation logic when an “Operate command P2 (PLC-P2-Control)” 
signal is generated by the PLC function. There are two input points for the reception of this 
command signal, like in the “Operate command P2 (PLC-P2-Control)” signal.    That is, if an 
interlock  check  is  required,  apply  the  signal  at  connection  point  (PLC#3:i.e., 
DEV01_P2_INTERLOCK). On the other hand, if an interlock check is not required, apply the 
signal at connection point (PLC#4:i.e., DEV01_P2_COMMAND). PLC#3 and PLC#4 here are