6F2S1914 (0.49)
GRL200 (Soft 033 & 037)
- 867 -
DPOS01 function (Function ID: 512001)
Assign to BOs
Operate Cmd.
with ILK condition
[DPOS01-PLSM]*
Fix
Var
S
R
Operate Failed
0
t
1.0s- 100.0s
0.1 50.0 s
[DPOS01-RST]
[DPOS01-CPW]
Operation Cmd.
without ILK condition
Operate condition
[DPOS01-LGCTRCON]
Fixedlogic
Fixedlogic
[DPOS01-LGCFEXOT]
DEV01_CONTROL_REQ
Command Remote-Off-Control
512001_7001016D08
ILK condition (“OFF”) passed
DPOS01-Open
ASEQ function§ is in progress
ASEQ_MULTI_SEL
DPOS01IN_TMP_34
512001 800301EE56
User configurable condition
(PLC#3 connection point)
DPOS01_FEC_OK_CSF
DPOS01_FEC_OK_CSF
(512001 8003011E7E)
&
&
1
&
1
1
&
&
&
DPOS01_FEX_BO §§
(512001 8103011DD0)
DPOS01_EX_FFL
(512001 8603011E91)
Input
Output
Operate logic in DPOS01
To BO connection
To Wait for a command
DPOS01_FEC_OK_CS
(512001 8003011E81)
&
Detection of state-change in a device
&
DPOS01IN_TMP_42
512001 820301EE5E
User configurable condition
(PLC#2 connection point)
1
&
DPOS01_EX_CMP
(512001 8003011E93)
Operate Completed
Figure 4.8-22 Operate Off from the remote-end in DPOS01
††
Note: The ILK function can provide the operation criteria for “Off.
Note: An “operate condition signal is generated in the operate-condition logic (see
Figure 4.8-31), when Fixlogic is set for scheme switch [DPOS01-LGCTRCON]. If
an alternative “operate-condition” is required, it can be programmed by the user
and used to replace the signal generated by the original operate-condition logic.
The alternative “operate-condition” can be connected to the above logic using
connection point #3 “User-configurable condition. That is set the [DPOS01-
LGCTRCON] to PLC and use “DPOS01IN_TMP_34.
§Note: The ASEQ function can provide sequential signals for automatic control.
§§Note: The “DPOS01_OEX_BO” signal is issued when Fixedlogic is set for scheme
switch [DPOS01-LGCFEXOT]. The “Operate completed” signal can also be issued
from logic programmed by the user in place of the logic shown in Figure 4.8-20.
The user programmed logic is connected internally to the signal “Operate
completed”, hence this signal is now generated the user-programmed logic at
connection point #2 “User-configurable condition”. That is, set the scheme switch
[DPOS01-LGCFEXOT] to PLC and use “DPOS01IN_TMP_42”.
*Note: The user can select a type of output signal. When Var is set for scheme switch
[DPOS01-PLSM], the output period of the signal is defined by the setting
[DPOS01-CPW]. When Fix is set, the signal ceases when the 43-switch is changed.

Table of Contents