EasyManua.ls Logo

Toshiba GR200 Series - Page 892

Toshiba GR200 Series
1770 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
6F2S1914 (0.49)
GRL200 (Soft 033 & 037)
- 869 -
DPOS1 function (Function ID: 512001)
Operate Cmd.
with ILK condition
S
R
0.1 50.0 s
[DPOS01-CPW]
Operate Cmd.
without ILK condition
[DPOS01-LGCTRCON]
Fixedlogic
Command Local-On-Control
ILK condition (“ON”) passed
DPOS01-Close
DPOS01IN_TMP_35
512001 810301EE57
User configurable condition (PLC#1 connection point)
DPOS01_OEC_OK_CSF
(512001 8003011E7F)
&
&
1
&
1
1
&
&
Input
Output
Operate logic in DPOS01
1
ILK bypassing
ICB_STATE
To BO connection
DPOS01_OEC_OK_CS”
(512001 8103011E82)
[DPOS01-PLSM]*
Fix
Var
Operate Failed
[DPOS01-RST]
ASEQ function§ is in progress
ASEQ_MULTI_SEL
DPOS01_OEC_OK_CSF
DPOS01_EX_FFL
††
(512001 8603011E91)
To Wait for a command
&
Detection of state-change in a device
&
DPOS01IN_TMP_42
512001 820301EE5E
User configurable condition
(PLC#2 connection point)
1
&
DPOS01_EX_CMP
(512001 8003011E93)
Operate Completed
Operate condition
Fixedlogic
[DPOS01-LGCFEXOT]
Assign to BOs
&
DPOS01_OEX_BO §§
(512001 8203011DD3)
To BO connection
1.0s- 100.0s
0
t
Figure 4.8-24 Operate On on the front panel in DPOS01††
Note: The ILK function can provide the operation criteria for “On”.
Note: An “operate condition signal is generated in the operate-condition logic (see
Figure 4.8-31), when Fixlogic is set for scheme switch [DPOS01-LGCTRCON]. If
an alternative “operate-condition” is required, it can be programmed by the user
and used to replace the signal generated by the original operate-condition logic.
The alternative “operate-condition” can be connected to the above using
connection point #1 user configurable condition. That is set the [DPOS01-
LGCTRCON] to PLC and use DPOS01IN_TMP_35.
§Note: The ASEQ function can provide sequential signals for automatic control.
§§Note: The “DPOS01_OEX_BO” signal is issued when Fixedlogic is set for scheme
switch [DPOS01-LGCFEXOT]. The “Operate comleted” signal can also be issued
from logic programmed by the user in place of the logic shown in Figure 4.8-20.
The user-programmed logic is connected internally to the signal “Operate
completed”, hence this is now generated by the user-programmed logic at
connection point #2 “User configurable condition”. That is, set the scheme switch
[DPOS01-LGCFEXOT] to PLC and use “DPOS01IN_TMP_42”.
*Note: The user can set the type of output signal. When Var is set for scheme switch
[DPOS01-PLSM], the output period of the signal is defined by the setting
[DPOS01-CPW]. When Fix is set, the signal ceases when the 43-switch is changed.

Table of Contents

Related product manuals