EasyManua.ls Logo

Toshiba GR200 Series - Page 1678

Toshiba GR200 Series
1770 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
6F2S1914 (0.49)
GRL200 (Soft 033 & 037)
- 1655 -
Positions
[Software selection]
7
S
G
T
E
F
U
9
V
Configurations
G
R
L
2
0
0
-
0
3
-
-
Application of power system
Assignment at ‘7’ (see p.1649)
Function block
See Function table (see p.1656)
1ch communication of the remote end / Time Synch.
Assignment at ‘E’ position (see p.1653)
Assignment at ‘F’ position (see p.1653)
2ch communication of remote ends / Time Synch.
Assignment at ‘E’ position (see p.1654)
Assignment at ‘F’ position (see p.1654)
Protocol1
IEC60870-5-103 or IEC 61850
1
IEC 61850
2
Outline
Assignment at ‘9’ position (see p. 1650 or 1651)
Language
English
E
1
One of the codes (i.e., 1 or 2 at positons U) has to be selected to be relevant for the users purpose:
Table Protocol relevant table
Software model at Position “G&T”
Ordering code at Position “U”
1
2
IEC 61850†2
33
37
IEC 60870-5-103†3
33
NA
37
: Valid NA: Not applicable
2
Duplicated LAN modules are required for the hot-standby. For the PRP/HSR/RSTP, choose LAN
modules including “L” or “N” code at position E (see p. 1653 or 1654).
3
For IEC60870-103, a serial module (RS485 or fiber) is required (see p. 1653 or 1654).

Table of Contents

Related product manuals