- 941 -
TPOS01 function (Function ID: 513001)
Operate Cmd.
with ILK† condition
Operate Cmd.
without ILK† condition
Command Local-P1-Control”
User configurable condition (PLC#3 connection point)
“TPOS01_P1EC_OK_CSF”
(513001 8004011E7E)
“TPOS01_P1EX_BO”
(5130018104011DD0) §§
“TPOS01_P1EC_OK_CS”
(5130018004011E81)
ASEQ function§” is in progress
“TPOS01_P1EC_OK_CSF”
(513001 8004011E7E)
“TPOS01_EX_FFL”
(513001 8604011E91) ‡‡
Detection of state-change in a device
User configurable condition
(PLC#2 connection point)
“TPOS01_EX_CMP”
(5130018004011E93)
ILK† condition (“P1”) passed
Figure 4.9-33 Operate ‘P1-control’ on the front panel TPOS01
††
†Note: The ILK function can provide the operation criteria for “P1” control.
‡Note: An “operate condition” signal is generated in the operate-condition logic (Figure
4.9-44) when Fixlogic is set for scheme switch [TPOS01-LGCTRCON]. If an
alternative “operate-condition” is required it can be programmed by the user and
used to replace the signal generated by the original operate-condition logic. The
alternative “operate-condition” can be connected to the above logic using
connection point #3 “User configurable condition” That is, set the scheme switch
[TPOS01-LGCTRCON] to PLC and use “TPOS01IN_TMP_28”.
§Note: The ASEQ function can provide sequential signals for automatic control.
*Note: The user can set the type of output signal. When Var is set for scheme switch
[TPOS01-PLSM], the output period of the signal is defined by the setting
[TPOS01-CPW]. When Fix is set, the signal ceases when the 43S or an ES is
changed.
††
Note: To identify the input and output signal-points of the P1-control in the other TPOS
logics, see Table 4.9-15 for PLC#1, Table 4.9-16 for PLC#2 and Table 4.9-20 for the
outputs.
‡‡Note: The “Operate failed” signal is issued when the state-change is not detected until
after reaching the time set by the setting [TPOS01-RST].