EasyManua.ls Logo

Lenze E84AVHC Series - 3.7 Commissioning the Switch-off positioning TA using Engineer

Lenze E84AVHC Series
1118 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
8400 HighLine | Parameter setting & configuration
Commissioning
Commissioning the "Switch-off positioning" TA using »Engineer«
60 L Firmware 05.00 - DMS 4.2 EN - 02/2010
3.7 Commissioning the "Switch-off positioning" TA using »Engineer«
System constellation
[3-4] Block diagram for wiring of the commissioning example for the "Switch-off positioning" application
Example: Way in which sequential positioning with pre-switch off functions
The drive controller is enabled with X5/RFR = TRUE and started with X5/DI3 = TRUE in clockwise rotation (Cw).
The drive accelerates along the acceleration ramp (C00012
) to the traversing speed set with C00039/3.
At the DI2 contact, the drive brakes along the deceleration ramp (C00013
) until it reaches the creeping speed set
with C00039/2
.
After reaching the DI1 contact, the drive comes to a stop with quick stop (QSP) in the target position.
When X5/DI4 = TRUE (X5/DI3 = FALSE), counter-clockwise rotation (Ccw) is started.
The drive is accelerated along the acceleration ramp (C00012
) until it reaches the traversing speed set with
C00039/3
.
At the DI6 contact, the drive brakes along the deceleration ramp (C00013
) until it reaches the creeping speed set
with C00039/2
.
After reaching the DI5 contact, the drive comes to a stop in the initial position with quick stop (QSP).
UV
W
X5
X5
X6
RFR
DI5
DI6
DI3
DI4
DI1DI2
24I
M
3~
i
RFR
DIAG
X61
X6
t [s]
C39/2
0
1
0
1
0
0
1
1
QSP
Cw
Ccw
-
DI2
DI6
DI1
DI3
DI2DI1
DI6 DI5
8400 HighLine
DI1
DI2
DI6
DI5
DI5
DI4
v [m/s]
C39/3
C12
C12
C13
C13
C39/3
C39/2
efesotomasyon.com - Lenze

Table of Contents

Related product manuals