EasyManua.ls Logo

Xerox WorkCentre 7132

Xerox WorkCentre 7132
1726 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
January 2007
2-759
WorkCentre 7132
116-352, 116-353
Status-indicator-raps
Revision
116-352 NetWare Software RAP
An internal shutdown occurred after a NetWare processing error.
Initial Actions
Power Off/On
Procedure
Pull out and insert or replace the DIMM (PL 11.2).
If the problem persists reload Software (ADJ 9.3.1).
If the problem persists, replace the ESS PWB (PL 11.2).
116-353 HDD Mechanical RAP
A mechanical error occurred in the HDD.
Initial Actions
Power Off/On
Procedure
Check the connection of each ESS PWB connector. The connectors are correctly con-
nected.
YN
Connect the connectors.
Turn on the power again. The problem persists.
YN
Return to Service Call Procedures.
Check the HDD electrical connections (PL 11.2).
If the problem persists perform Hard Disk Diagnostic Program.
If the problem persists replace the HDD (PL 11.2).

Table of Contents

Other manuals for Xerox WorkCentre 7132

Related product manuals