January 2007
4-82
WorkCentre 7132
REP 11.3.2
Reversion 4.0
Repairs/Adjustments
Figure 6 Disconnecting the connectors (4)
9. Disconnect the large ribbon cable on the IIT/IPS PWB. (Figure 7)
Figure 7 Disconnecting the large ribbon cable
10. Remove the IIT/IPS PWB. (Figure 8)
Disconnect the connectors (3)
1
Lift up the connector locking bar
2
Remove the ribbon cable