EasyManua.ls Logo

Alcatel-Lucent OmniSwitch 6250 - OmniSwitch 6250-P24 Front Panel

Alcatel-Lucent OmniSwitch 6250
2018 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
CMM Commands
OmniSwitch 6250 CLI Reference Guide November 2009 page 1-17
show reload
Shows the status of any time delayed reboot(s) that are pending on the switch.
show reload [status]
Syntax Definitions
N/A
Defaults
N/A
Platforms Supported
OmniSwitch 6250
Usage Guidelines
It is possible to preset a reboot on a CMM by using the reload command. If this is done, use the show
reload command to see when the next scheduled reboot will occur.
If the reload working command was used, and a rollback timeout was set, the time the rollback will
occur is shown using the show reload command.
This command can also be used on the secondary CMM.
Examples
-> show reload status
Primary Control Module Reload Status: No Reboot Scheduled,
Secondary Control Module Reload Status: No Reboot Scheduled
Release History
Release 6.6.1; command was introduced.
Related Commands
reload Reboots the primary or secondary CMM to its startup software configura-
tion.
reload working Immediate primary CMM reboot to the working software configuration
without secondary CMM takeover.

Table of Contents

Other manuals for Alcatel-Lucent OmniSwitch 6250

Related product manuals