Date VerificationFH/FZ5 Processing Item Function Reference Manual
401
2
Inspecting and Measuring
Date Verification
This processing item creates a target string from the current date/time and compares it with read-in strings.
Used in the Following Case
• When inspecting date of manufacture
Settings Flow (Date Verification)
Follow the steps below to set up [Date Verification].
Example) Inspecting date labels to be attached to products
Necessary Steps Optional Steps
Very/Adjust results
â–²
Verification Parameters (Date Verification)
â–²
Date Parameters (Date Verification)
Start
Settings completed
Test measurement
â–²
Output Parameters (Date Verification)
â–²
Code Parameters (Date Verification)

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Omron fh-3 series and is the answer not in the manual?

Omron fh-3 series Specifications

General IconGeneral
BrandOmron
Modelfh-3 series
CategoryAccessories
LanguageEnglish

Related product manuals