EasyManua.ls Logo

Omron fh-3 series - Date Verification; Settings Flow (Date Verification)

Omron fh-3 series
904 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Date VerificationFH/FZ5 Processing Item Function Reference Manual
401
2
Inspecting and Measuring
Date Verification
This processing item creates a target string from the current date/time and compares it with read-in strings.
Used in the Following Case
When inspecting date of manufacture
Settings Flow (Date Verification)
Follow the steps below to set up [Date Verification].
Example) Inspecting date labels to be attached to products
Necessary Steps Optional Steps
Very/Adjust results
Verification Parameters (Date Verification)
Date Parameters (Date Verification)
Start
Settings completed
Test measurement
Output Parameters (Date Verification)
Code Parameters (Date Verification)

Table of Contents

Related product manuals