EasyManua.ls Logo

Siemens G130 - Fig. 3-19 2410 - PROFIBUS (PB); PROFINET (PN), addresses and diagnostics

Siemens G130
1976 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
SINAMICS G130/G150
List Manual (LH2), 07/2016, A5E03263479A
1125
3 Function diagrams
3.6 PROFIdrive
Fig. 3-19 2410 – PROFIBUS (PB) / PROFINET (PN), addresses and diagnostics
- 2410 -
Function diagram
87654321
fp_2410_54_eng.vsd
DO: All objects
S120/S150/G130/G150
11.11.15 V04.08.00
PROFIdrive - PROFIBUS (PB) / PROFINET (PN), addresses and diagnostics
PROFIBUS sampling time
CU-specific functions
Setting the PROFIBUS address
PB address
1...126
p0918 (126)
Drive-specific functions (available once for each drive object)
POWER ON
Memory
SET
p0918
Actual
PROFIBUS
address
Monitoring functions
Sign-of-life from the
clock cycle
synchronous master
Diagnostic parameters
Cyclic telegrams
from the master
A01900 "PB/PN: Configuration telegram error"
A01902 "PB/PN: Clock cycle synchronous operation parameterization not permissible"
1...126
PB diag clock sync
r2064[0...7]
PB diag standard
r2055[0...2]
PB status
r2054
r2075 IF1 diag offs recv
r2076 IF1 diag offs send
t
PB addr switch dia
r2057
PROFINET address
PN Name of Station
r61000[0...239]
PN IP of Station
r61001[0...3]
PD PZD state Clock cycle synchronous operation active
r2043.1
<7>
<7>
Address switches
on the Control Unit
DP ADDRESS
Example: 15 hex = 21 dez
Setting the PROFIBUS address:
- Via p0918:
Set the address switches DP H and
DP L to 00 hex (= 0 dez), 7F hex
(= 127 dez), 80 hex or FF hex.
- Via the address switches
DP H and DP L:
Set the desired address as hexa-
decimal value between 01 hex
(= 1 dez) and 7E hex (= 126 dez).
Any change only becomes
effective after a POWER ON.
PB state t_monit
p2047
T0
<8>
<9>
>
Detecting
missing
signs-of-life
in a series
n
PD SoL_tol
0...65535
p0925 (1)
= 65535
<1>
&
No telegrams from the master
Alarms
Faults
n > p0925
F01911 "PB/PN: Clock cycle synchronous operation clock cycle failure"
A01921 "PROFIBUS: Receive setpoints after To"
A01930 "PB/PN: Current controller sampling time clock cycle synchronous not equal"
A01931 "PB/PN: Speed controller sampling time clock cycle synchronous not equal"
A01940 "PB/PN: Clock cycle synchronism not reached"
A01941 "PB/PN: Clock cycle signal missing when establishing bus communication"
A01943 "PB/PN: Clock cycle signal error when establishing bus communication"
A01944 "PB/PN: Sign-of-life synchronism not reached"
A01950 "PB/PN: Clock cycle synchronous operation synchronization unsuccessful"
<5>
<1> The monitoring function is only executed after at least one "valid" cyclic
telegram has been received. "Valid" means: the master is in operation
and net data are transmitted.
<2> The monitoring function is only executed after the first sign-of-life has
been received.
<3> Sign-of-life monitoring not effective for p0925 = 65535.
<4> The response monitoring time t_response is automatically defined when
configuring PROFIBUS/PROFINET (e.g. HW Config made by
SIEMENS).
<5> Only for the clock-cycle synchronous operation of the SERVO and
VECTOR drive object.
<6> p2045 is automatically interconnected when the telegram is selected.
<7> Only SINAMICS S120/S150 (no clock cycle synchronous operation with
G130/G150).
<8> Only for cyclic operation.
<9> Not when the master CPU stops.
F01912
"PB/PN: Clock cycle synchronous operation sign-of-life failure"
<5>
r2050[3]
PD mast-SoL S_Src
(0)
p2045
PD mast-SoL diag
r2065
<6>
<5>
PD fault delay
0...100 [s]
p2044 (0)
F01910 "Fieldbus: Setpoint timeout"
S Q
R Q
T0
<2>
<3>
<7>
<7>
<9>
t > t_response <4> No cyclic telegrams from the master
A01920 "PROFIBUS: Interruption cyclic connection"
0
2
3
4
5
6
A
B
C
9
8
7
D
E
F
1
0
2
3
4
5
6
A
B
C
9
8
7
D
E
F
1
DP LDP H
PN stat cyc conn
r8936[0...1]
PN diag
r8937[0...5]
PD PZD state Setpoint failure
r2043.0

Table of Contents

Related product manuals