EasyManua.ls Logo

Siemens G130 - A08520 (F) PN;COMM BOARD: Non-cyclic channel error; A08526 (F) PN;COMM BOARD: No cyclic connection

Siemens G130
1976 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
SINAMICS G130/G150
List Manual (LH2), 07/2016, A5E03263479A
1635
4 Faults and alarms
4.2 List of faults and alarms
Remedy: Check the receive configuration data.
For alarm value = 1, 2:
- check the list of the drive objects with process data exchange (p0978). With p0978[x] = 0, all of the following drive
objects in the list are excluded from the process data exchange.
For alarm value = 2:
- check the number of data words for output and input to a drive object.
For alarm value = 17:
- CBE20 Shared Device: Unplug/plug A-CPU.
For alarm value = 223, 500:
- check the setting in p8839 and p8815.
- ensure that only one PZD interface is operated in clock synchronism or with PROFIsafe.
For alarm value = 501:
- check the set PROFIsafe address (p9610).
Reaction upon F: Vector: NONE (OFF1, OFF2, OFF3)
Infeed: NONE (OFF1, OFF2)
Acknowl. upon F: IMMEDIATELY
A08520 (F) PN/COMM BOARD: Non-cyclic channel error
Message value: %1
Message class: Communication error to the higher-level control system (9)
Drive object: All objects
Component: None Propagation: GLOBAL
Reaction: NONE
Acknowledge: NONE
Cause: The memory or the buffer status of the non-cyclic channel has an error.
Alarm value (r2124, interpret decimal):
0: Error in the buffer status.
1: Error in the memory.
Remedy: Check communications link.
Reaction upon F: Vector: NONE (OFF1, OFF2, OFF3)
Infeed: NONE (OFF1, OFF2)
Acknowl. upon F: IMMEDIATELY
A08526 (F) PN/COMM BOARD: No cyclic connection
Message value: -
Message class: Communication error to the higher-level control system (9)
Drive object: All objects
Component: None Propagation: GLOBAL
Reaction: NONE
Acknowledge: NONE
Cause: There is no cyclic connection to the control.
Remedy: Establish the cyclic connection and activate the control with cyclic operation.
For PROFINET, check the parameters "Name of Station" and "IP of Station" (r61000, r61001).
If a CBE20 is inserted and PROFIBUS is to communicate via PZD Interface 1, then this must be parameterized using
the STARTER commissioning tool or directly using p8839.
Reaction upon F: NONE (OFF1)
Acknowl. upon F: IMMEDIATELY

Table of Contents

Related product manuals