EasyManua.ls Logo

R&S RTO6 - 19.1.1.3 Report; Test results

R&S RTO6
2677 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Power analysis (option R&S RTO6-K31)
R&S
®
RT
O6
1129User Manual 1801.6687.02 ─ 05
Remote command:
POWer:
REPort:DESCription
on page 2523
19.1.1.3 Report
Access "Analysis">"Power" > "Report".
Test results
After executing a measurement, you can press "Add to report" and save the results. In
this tab, you can manage all saved measurement results.
At the top of the tab, you can switch through the different "Power Analysis" measure-
ments.
Report Table
Shows a list of the available measurements.
After you select a Directory, you can manage previous report results from this direc-
tory. T
o add a measurement report press "Insert" or "Append". To remove a measure-
ment report press "Remove".
"DUT"
Shows the name of the DUT, see Chapter 19.1.1.2, "DUT",
on page 1
127.
"Date"
Shows the date of the measurement.
"Time"
Shows at what time, the measurement result was added to report.
"Comment"
Enters a comment.
"Add"
Adds the selected measurement to the report.
Remote command:
POWer:REPort:TEST:
ADD on page 2524
POWer:REPort:TEST:COMMent on page 2526
Power measurement selection

Table of Contents

Other manuals for R&S RTO6

Related product manuals