EasyManua.ls Logo

R&S RTO6 - Area measurements

R&S RTO6
2677 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Measurements
R&S
®
RTO6
320User Manual 1801.6687.02 ─ 05
Meas. type Symbol Description/Result
+
-
Pos. switching T
PosSw
Settling time at rising edges: Time between crossing the lower
reference level and the last return of the signal into the top toler-
ance tube.
See also:Chapter 8.2.4.3, "Advanced tab", on page
314
+
-
Neg. switching T
NegSw
Settling time at falling edges: Time between crossing the upper
reference level and the last return of the signal into the bottom
tolerance tube. See also "Pos. switching"
above.
t?
Pulse train
Duration of N positive pulses, measured from the rising edge of
the first pulse to the falling edge of the N-th pulse. Define N for
the measurement.
t
Setup
Hold
Setup/Hold time
T
Setup
and
T
Hold
Setup and Hold time measurement with positive and/or negative
clock edge.
See: "Setup/Hold measurement settings"
on page 324
t
Setup/Hold ratio T
Setup
/
(T
S
etup
+
T
Hold
)
Setup/Hold ratio measurement with positive and/or negative
clock edge.
See: "Setup/Hold measurement settings
"
on page 324
Delay to trigger
Time between the trigger event and a following signal slope.
High accuracy even if the trigger event is outside the acquisition
data.
See:
"Delay to trigger measurement settings"
on page 326
Area measurements
Access: [Measure] > "Setup" tab > "Amp/Time" category
Area measurements are voltage over time measurements.
Automatic measurements

Table of Contents

Other manuals for R&S RTO6

Related product manuals