1/05
9-44
DocuColor 12/DCCS50
Reissue
Installation Instructions
Figure 4 Right Upper Cover Cable Exit
5. If the EPC Enablement Kit is being installed at the same time as the EPC Kit: Return
to
step 19 of Installing the Scan Cable in the EPC Enablement Kit installation instructions.
If the EPC Enablement Kit is not being installed at the same time: Continue w
ith
these instructions.
6. Reinstall the Right Upper Cover.
EPC Assembly Installation
1. NOT
E: If
you are installing the EPC Enablement Kit at the same time as the EPC Kit
locate the 4 thumb nuts provided with the enablement kit, they will be used in place of the
4 (M4x6mm) screws for Steps (1 and 2)
Install and temporarily tighten the 2 upper screws on the IOT Rear Cover (Fi
gu
re 5):
Figure 5 Preparing to install EPC Assembly
2. Install the EPC Assembly (Figure
6):
1
Right Upper
Cover with
break-away
tab
2
Right Upper Cover
with break-away Tab
removed
1
M4x6mm
screws (2)
manuals4you.commanuals4you.com