EasyManua.ls Logo

Arris C4C - Bring-Up Procedures

Arris C4C
3180 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Chapter 11: Basic Bring-up Procedure for the C4 CMTS
STANDARD Revision 1.0 C4® CMTS Release 8.3 User Guide
© 2016 ARRIS Enterprises LLC. All Rights Reserved. 330
Bring-up Procedures
The following is a high-level list of the steps of this procedure:
see "1. Install Cards, Rear PICs, Filler Panels, PCMs, and Fans (page 331)
see "2. Set Up Console Cable (page 332)
see "3. Power Up the Chassis (page 333)
see "4. Configure Slots (page 333)
see "5. Configure RCM Ethernet Connections (page 333)
see "6. Configure MAC Domains (page 333)
see "7. Configure Downstream Parameters (page 334)
see "8. Configure Upstream Parameters (page 335)
see "9. Configure Fiber Node and Topology (page 337)
see "10. Configure a Dynamic Bonding Group (page 337)
see "11. Configure RCC Management (page 337)
see "12. Local Authentication (page 338)
see "13. Managing the C4 CMTS (page 338)
see "14. Configure the SNMP (page 339)
see "15. Configure Clock (page 340)
see "16. Save the Configuration (page 340)
see "17. Cable CAMs and RCM (page 340)
see "18. Configure/Verify Back Office Systems (page 341)
see "19. Verify the C4 CMTS Configuration (page 341)
see "20. Verify Modem Registration (page 343)

Table of Contents

Related product manuals